Hospital or diagnostic centre
Apply to put your hospital or diagnostic centre on ScanSureX — then a guided onboarding takes you from an accepted application to a published, bookable centre.
Apply, then we onboard youAbout this programme
Every other partner signs up in a portal of its own. A hospital cannot, because its portal is created BY the onboarding it is applying for — so the application form lives here, on the public site. Submitting files an application and nothing more: no account, no tenant, no billing record. A ScanSureX administrator reads it, and acceptance is what opens your portal and starts the staged onboarding that ends with your centre live and bookable.
Worth knowing first
You fill the form yourself. You do not need a ScanSureX salesperson to enter your details on your behalf.
An application creates no account and no charge. A person reviews it and you are emailed the decision.
Branches, integration, modalities, test mapping and rate cards each have to be genuinely done before the next stage opens.
Applying
You run a hospital or a diagnostic centre and want to join ScanSureX.
- 1Have four things ready
Organization name, city, official email and phone, and the modalities you run — CT, MRI, X-ray, ultrasound, mammography, PET-CT, DEXA, fluoroscopy. Nothing has to be uploaded yet.
- 2Say which you are
Hospital or diagnostic centre. The two are onboarded the same way but sign in at different portal addresses, so the choice matters.
- 3Choose your sign-in email and password
The official email becomes your portal username and the password you set here is the one you will sign in with — once, and only once, the application is accepted.
- 4Submit the application
You get a reference code in the form SSX-XXXXXXXX and an acknowledgement email. Keep the code; it is how you ask about your own application later.
- 5Wait for a person
A ScanSureX administrator reads every application. There is no automatic acceptance and nothing is provisioned while it waits.
- 6Check where it stands
Come back to the form's status check and give both the reference code and the email you applied with. Either one alone will not answer — that is deliberate, so applications cannot be enumerated.
- 7Accepted — sign in
Acceptance opens your portal and the status check hands you the right sign-in address for your organization type. Onboarding starts there.
Onboarding your centre
Your application was accepted and you are working through the checklist in your own portal.
- 1Tenant created
Acceptance provisions your tenant — the account your branches, equipment, staff and pricing hang off. This is the first stage the platform records.
- 2Upload compliance documents
Clinical establishment licence, radiology certification and GST registration. This is the paperwork that was explicitly not required to apply.
- 3Configure at least one branch
The stage will not advance without one active branch. A centre with no branch has no place to send a patient.
- 4Configure integration
One default integration mode that is enabled, approved and validated — all three. How studies and reports move between your systems and ScanSureX.
- 5Declare your modalities
At least one active, verified piece of equipment. Verified, not merely listed — an unverified machine does not count towards the gate.
- 6Map your tests
Mapping starts once there is something to map: an approved product or a local test mapping. Your test names are matched to the platform's catalogue so a booking means the same thing on both sides.
- 7Build the rate card
At least one active rate-card line. B2B, B2C or both, depending on the channels you have enabled.
- 8Get the rate card validated
The hard gate: for every channel you enabled, every active line must be approved AND published. One unpublished line holds the whole centre back.
- 9Submit for approval
With the rate card validated, the tenant goes to ScanSureX for final approval.
- 10Approved, then published
Approval is the decision; publishing is what makes your centre visible and bookable to patients. They are two separate steps and only the second one goes live.
Good to know
- Registered and accepted are not the same thing — submitting the form creates no tenant, no portal account and no charge.
- One pending application per email address. A second one is refused and told the reference code of the first.
- The status check needs the reference code AND the email it was filed with; a mismatch looks identical to no application at all.
- Compliance documents — clinical establishment licence, radiology certification, GST registration — are uploaded in your portal after acceptance, not with the form.
- Hospitals and diagnostic centres sign in at different addresses; the status check gives you the right one when you are accepted.
- Go-live is blocked until every active rate-card line on each enabled channel is both approved and published.
How money moves
There is no charge to apply and no account exists until an administrator accepts you. Commercial terms are settled in the rate-card stage of onboarding, and the centre cannot go live until every active rate-card line on every channel you enabled is approved and published.

